PEMEX/PEP, as our main customer, implements strategic and sustainable plans for the development of its infrastructure in order to maintain and increase oil (petroleum) production levels in offshore fields and thus meet production goals to ensure energy in the country.
In BLUE MARINE, SUBTEC and in DURANDCO INDUSTRIAL GROUP we are proud to have been and be a fundamental part in the development of one of the most important strategic projects for PEP and to contribute to the achievement of this objective, being the first national company to install the SUCTION PILE TECHNOLOGY , with the support of our boat BLUE GIANT (FORMERLY GAZPROM-2).
This vessel is unique in the Campeche probe and has the specialized characteristics for the execution of this type of project; In addition, we are excited to make it a reality that the wells of POKCHE have a relocatable structure EMDR-1 POKCHE-NE PLATFORM, which will allow greater exploitation and management of the deposit, generating additional volumes of crude oil.
It is a crystallized dream that shows that we are on the right path, working hand in hand for the good of the country's energy sector and strengthening Mexico's oil industry. In this way, we confirm that we are a company with a highly professional workforce committed to the nation.